PIPE PROTECTION MESH

  • RGHD 2" PIPE - 50 SQFT 12"x50' - 17LB PER ROLL ROCKGUARD - RG219

    Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13187
    Available
    More Info
  • RGHD 4" PIPE - 87.5 SQFT 21"x5' - 30LB PER ROLL ROCKGUARD - RG220

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13188
    Available
    More Info
  • RGHD 6" PIPE - 116.5.5 SQFT 28"x50' - 40LB PER ROLL ROCKGUARD - RG221

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13189
    Available
    More Info
  • RGHD 8" PIPE - 150 SQFT 3'x50' - 51LB PER ROLL ROCKGUARD - RG228

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13203
    Available
    More Info
  • RGHD 10" PIPE - 175 SQFT 3.5'x50' - 60LB PER ROLL ROCKGUARD - RG232

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13204
    Available
    More Info
  • RGHD 12" PIPE - 200 SQFT 4'x50' - 68LB PER ROLL ROCKGUARD - RG227

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13205
    Available
    More Info
  • RGHD 16" PIPE - 237.5 SQFT 4.7'x50' - 81LB PER ROLL ROCKGUARD - RG237

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13206
    Available
    More Info
  • RGHD 18" PIPE - 300 SQFT 6'x50' - 102LB PER ROLL ROCKGUARD - RG206

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13207
    Available
    More Info
  • RGHD 24" PIPE - 280 SQFT 7'x40' - 102LB PER ROLL ROCKGUARD - RG3F711

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13208
    Available
    More Info
  • RGHD 30" PIPE - 58.9 SQFT 8.42'x7' - 20LB PER ROLL ROCKGUARD 7' PAD - RG2F812

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13209
    Available
    More Info
  • RGHD 34" PIPE - 65.9 SQFT 9.42'x7' - 22LB PER ROLL ROCKGUARD 7' PAD - RG2F828

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13211
    Available
    More Info
  • RGHD 36" PIPE - 70 SQFT 10'x7' - 24LB PER ROLL ROCKGUARD 7' PAD - RG2F8120

    • Does not interfere with cathodic protection - It has Holes to allow current flow. 

    • Excellent impact and compressive strengths

    • Initial protection during handling and backfill operations

    • Long term protection from geologic movement, pipeline vibration and future excavation

    • Consistent 11 mm thickness throughout the roll or pad to provide full protection

    • Uniform open mesh with channels designed to resist wicking and prevent water storage next to the pipe

    • Chemically inert and will not rot

    • Effective in all climates

    • Flexible for easy handling even in extremely low temperatures

    • Ergonomically correct light weight minimizes risk of injury and allows for quick, efficient installation

    • Custom sized rolls and pads for every pipeline diameter

    Storage

    • Check the Rock Shield on arrival. 
    • Store Rock Shield underneath tarps to protect from oil, dirt, and sunlight.

     Installation Instructions

    • Rock Shield rolls or pads shall be affixed to pipe utilizing non-metallic bands of ¾” wide filament tape. 
    • Rock Shield shall completely encircle the pipe with a minimum overlap of 6 inches. 
    • Overlap shall be located at the bottom radius (6 o’clock position). 
    • Roll to roll and pad to pad overlap shall be a minimum of 2 inches. 
    • Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 
    • Follow manufacturer’s recommendations.
    Code: 13212
    Available
    More Info