AC COUPON ACC2-1-20 1cm˛ 20m #12/7 STR RWU 90 GREEN
Due to an unprecedented level of public awareness towards new and existing energy infrastructure, finding the space required to build buried pipelines and overhead power lines is becoming increasingly difficult. The logical solution is to utilize shared right of ways (ROW). However, modern pipelines buried in close proximity high voltage overhead power lines have the potential to pick-up AC current, causing both a public safety risk due to electric shock, and a corrosion risk due to AC corrosion. This is why Corrosion Service developed a class leading AC Coupon, which allows pipeline operators to monitor induced AC current density, and install mitigation measures in areas where the risk is highest.